New Solution for ICT/ELV Infrastructure Project Reporting Using Datalink Technique System
Keywords:
Datalink Technique System (DTS), Section Link Page Program(SLPP), Tabulation Detailed Project Reporting (TDPR), Variation Order(VO), Very Early System Program Alarm (VESPA),Abstract
In infrastructure project, a failure on reliable project reporting will lead to Variation Order (VO) and Project Delay issues. It is now a normal phenomenon, which leads to many negative effects such as lawsuits, claims, loss of productivity and revenue, which may also lead to contract termination. Hence, the research aims to develop a new solution system program, called Datalink Technique System (DTS) to solve the problems that occur in an infrastructure project. The objective is to eliminate the loss and reduce the project cost. However, it is not limited to that as in future it can also be applied to others. DTS introduces the new advanced technologies system solution and reliable, yet it is still consistent with the current approach to manage the project. The program produces data/information correctly and precisely.References
Analysis of Project Failure Factors for Infrastructure Projects in Saudi Arabia: A Multivariate Approach, Dubem I. Ikediashi, Stephen O. Ogunlana and Abdulaziz Alotaibi, Journal of Construction in Developing Countries, 19(1), 35–52, 2014.
Significant Causes and Effects of Variation Orders in Construction Projects, Aftab Hameed Memon, Ismail Abdul Rahman and Mohamad Faris Abul Hasan , Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, Malaysia, Research Journal of Applied Sciences, Engineering and Technology 7(21): 4494-4502, 2014.
Mokhtar, A., Bedard, C. & Fazio, P. (2000)" Collaborative planning and scheduling of interrelated design changes". Journal of Architectural Engineering, ASCE, Vol. 6, No.2, pp. 66-75.
Assaf, S.A., Al-Khalil, M. & Al-Hazmi, M. (1995) "Causes of delays in large building construction projects." Journal of Construction Engineering and Management, ASCE, Vol.11, No.2, pp. 45-50.
The practice of time management on Construction project, Procedia Engineering, ELSEVIER, volume 125, 2015, page 32-39.
Time and Cost controlling using critical path method (case study at Palur Fly-over Surakartza), by Adel Issa Elsosan , Master Program of Civil Engineering Study Department, Universitas Muhammadiyah Surakarta, 2015.
Downloads
Published
How to Cite
Issue
Section
License
TRANSFER OF COPYRIGHT AGREEMENT
The manuscript is herewith submitted for publication in the Journal of Telecommunication, Electronic and Computer Engineering (JTEC). It has not been published before, and it is not under consideration for publication in any other journals. It contains no material that is scandalous, obscene, libelous or otherwise contrary to law. When the manuscript is accepted for publication, I, as the author, hereby agree to transfer to JTEC, all rights including those pertaining to electronic forms and transmissions, under existing copyright laws, except for the following, which the author(s) specifically retain(s):
- All proprietary right other than copyright, such as patent rights
- The right to make further copies of all or part of the published article for my use in classroom teaching
- The right to reuse all or part of this manuscript in a compilation of my own works or in a textbook of which I am the author; and
- The right to make copies of the published work for internal distribution within the institution that employs me
I agree that copies made under these circumstances will continue to carry the copyright notice that appears in the original published work. I agree to inform my co-authors, if any, of the above terms. I certify that I have obtained written permission for the use of text, tables, and/or illustrations from any copyrighted source(s), and I agree to supply such written permission(s) to JTEC upon request.